Aspen Waste Systems
Location
Earth City, MO
Project Type
Office/Industrial
Role
Project Manager /Project Architect/Contract Administrator
Square Footage
12,000 SF
core Responsibilities:
Led the project through the full architectural process, serving in both Project Manager and Project Architect roles from design through Construction Administration. Managed project schedule and deliverables, performed building-code analysis, coordinated engineering disciplines, developed construction documents and specifications, and provided construction-phase services. Led the project through the local zoning and approval process, coordinating requirements associated with the facility’s outdoor truck and container storage.
key Contributions:
Led architectural project delivery from design through construction, including project management, technical documentation, consultant coordination, specifications, and Construction Administration.
Planned a mixed-use industrial facility integrating corporate office functions with a three-bay fleet maintenance operation.
Coordinated site planning around truck circulation, fleet parking, maintenance access, and outdoor container storage.
Navigated local zoning and development requirements to secure approvals for outdoor storage and the facility’s operational use.
Performed building-code analysis and incorporated applicable life-safety and occupancy requirements into the design and construction documents.
Managed multidisciplinary engineering coordination and project timelines to maintain an integrated design and documentation process.
Provided construction-phase oversight and coordination to address field conditions, contractor questions, and implementation of the design.